Skip to product information
1 of 4

Women's I Fight Graphic Tee | Plus Size | VCMCo.

Women's I Fight Graphic Tee | Plus Size | VCMCo.

Regular price $43.95 USD
Regular price $43.95 USD Sale price $43.95 USD
Sale Sold out
Shipping calculated at checkout.
Size
Color
Quantity

Women's I Fight Graphic Tee | Skull with Mickey Ears | Plus Size | VCMCo.

Virginia City Motorcycle Company • Nevada's Biker Lifestyle Brand

You know the type. She rides hard, laughs loud, and walks into every room like she already owns it. This shirt was made for her. VCMCo.'s I Fight Graphic Tee features our original badass skull with Mickey ears — gloves up, attitude cranked to eleven — screen-printed on a heavyweight curved-hem women's tee that looks as good at the rally as it does at the bar after. This isn't fan art. This is a statement.

The curved hem falls perfectly over your jeans, the medium-weight jersey fabric moves with you all day, and the bold graphic does all the talking. Whether you're parked on C Street in Virginia City, rolling into a Reno moto meetup, or just living your best biker lifestyle in Northern Nevada and beyond — the I Fight graphic tee is the one people are going to ask you about.

THIS TEE IS FOR THE WOMAN WHO:

  • Doesn't back down from anything — on the road or off it
  • Wants a graphic tee that actually has something to say
  • Loves a design that makes people do a double-take and then laugh out loud
  • Rides her own ride and dresses like it
  • Appreciates VCMCo.'s signature brand of fun, fierce, and totally Nevada

WHY IT WORKS:

  • 220g/m² jersey fabric — medium-weight, substantial feel, holds its shape wash after wash
  • 95% polyester / 5% spandex — stretch jersey that moves with you and stays comfortable all day
  • Curved hem design — flattering fit that pairs effortlessly with jeans, leggings, or riding pants
  • Short sleeves, crew neck — classic silhouette, easy to layer or wear solo
  • Original skull with Mickey ears graffiti graphic — bold, fun, and unmistakably VCMCo.
  • Plus size L through 5XL — inclusive sizing for every woman who fights her own fight

THE STORY BEHIND THE SHIRT:

VCMCo. designs apparel for real riders with real personality. The I Fight graphic was born from that same spirit — a little irreverent, a lot of fun, and 100% at home in the Nevada biker scene. Our skull with mickey ears is the graphic you didn't know you needed, on the tee you'll reach for every weekend. Designed in Virginia City, NV. Built for the ride and everything that comes after.

PRODUCT DETAILS:

  • Material: 95% polyester, 5% spandex (jersey knit)
  • Fabric weight: 220g/m² (medium-heavyweight)
  • Fit: Regular to plus size
  • Neckline: Crew neck
  • Sleeve: Short sleeve
  • Hem: Curved hem
  • Color: White
  • Sizes: L – 5XL
  • Care: Machine wash cold, similar colors only • No bleach • Tumble dry low • No iron • No dry clean
  • Made on demand please allow up to 30 days for delivery

PERFECT FOR: Women motorcycle riders • Biker lifestyle apparel • Graphic tees for women • Plus size biker shirts • Virginia City NV events • Nevada motorcycle rallies • Reno & Carson City moto meetups • Rally weekend outfits • Fun gifts for women riders • Skull graphic tees • Graffiti art shirts

Size Guide

Measurements taken when products are laid flat. Actual measurements may vary by up to 1".

Inch L XL 2XL 3XL 4XL 5XL
Length 27.4 28.0 28.5 29.1 29.7 30.3
Bust 44.9 47.2 49.6 52.0 54.3 56.7
Sleeve 9.7 10.2 10.7 11.3 11.8 12.3

 

Centimeter L XL 2XL 3XL 4XL 5XL
Length 69.5 71.0 72.5 74.0 75.5 77.0
Bust 114.0 120.0 126.0 132.0 138.0 144.0
Sleeve 24.7 26.0 27.3 28.6 29.9 31.2

Reviews

 Thank you for leaving your feedback on our motorcycle designs, our apparel and our accessories. 
View full details
Women with Motorcycle in Nowhere Nevada. Virginia City Motorcycle Company

My Guarantee

I know you are going to L.O.V.E. the design, shirt, jacket, vest, bell, helmet - anything you get from my website. And if you don't! You can always return it for a refund or exchange.

Great Gear Made Right Here in the U.S.A.

My Return & Exchange Policy